diff options
Diffstat (limited to 'gsoc/2011-05-31-project-schedule.org')
| -rwxr-xr-x | gsoc/2011-05-31-project-schedule.org | 67 |
1 files changed, 67 insertions, 0 deletions
diff --git a/gsoc/2011-05-31-project-schedule.org b/gsoc/2011-05-31-project-schedule.org new file mode 100755 index 0000000..5b71290 --- /dev/null +++ b/gsoc/2011-05-31-project-schedule.org @@ -0,0 +1,67 @@ +#+title: Project schedule +#+date: 2011-05-31 +#+layout: post +#+category: gsoc + +The following is a modification made by my mentors to the original +schedule found in [[http://www.google-melange.com/gsoc/proposal/review/google/gsoc2011/gnusosa/1][here]] + +**** Week #1:April 25 - 23 May +Gather current Dancer's core, plugin and packaging documentation, and +study this as an introduction. Arrange the working schedule with the +mentors based on the observed goals, and schedule a better working +process based on the timeline. + +**** Week #1: 24 - 28 May +Review and select suggestions from users, developers, and mentors on +the module. Study the possibilities of the upgrade module, and code a +rough draft to be worked on. + +**** Week #2: 29 May - 4 June +Finish successfully moving the old script intact to an object oriented +module. Write tests for the current object oriented module. + +**** Week #3: 5 - 11 June +Study =Catalyst= scripts and =Catalyst::ScriptRunner=, derive a code from +both to merge to the project. + +**** Week #4: 12 - 18 June +Write the upgrade methods and add tests for those. + +**** Week #5: 19 - 25 June +Add the module to Dancer's core and run it against several outdated +setups. Review the results and calibrate the tests to the resulting +patterns. + +**** Week #6: 26 June - 2 July +Add an upgrade log file +for the upgrade process for outdated Dancer setups. + +**** Week #7: 3 - 8 July +Go over the tests and add any +missing test to allow extensive coverage. + +**** Week #8: 10 - 16 July +Prepare the Midterm report, describe the status of the project and +further plans. + +**** Week #9: 17 - 23 July +Document the module, and the config.yml + +**** Week #10: 24 - 30 July +Write a code hand-out of the plugins implementation: How it must work, +how will it work and for what functions. Add detailed tests to each +plugin function. + +**** Week #11: 31 July - 6 August +Calibrate and polish the plugin implementations, while tracing each +test successful output to see what can be added. Write a rough draft +of the documentation relating the plugin feature. + +**** Week #12: 7 - 13 August +Review the documentation and make it more user-friendly. + +**** Week #13: 14 - 22 August +Finish what was left undone, make sure the tests are well-written, the +coverage is high and the documentation covers every aspect of the +project. |
