--- title: "Project schedule" date: 2011-05-31 layout: post category: gsoc --- The following is a modification made by my mentors to the original schedule found in [[http://www.google-melange.com/gsoc/proposal/review/google/gsoc2011/gnusosa/1][here]] **** Week #1:April 25 - 23 May Gather current Dancer's core, plugin and packaging documentation, and study this as an introduction. Arrange the working schedule with the mentors based on the observed goals, and schedule a better working process based on the timeline. **** Week #1: 24 - 28 May Review and select suggestions from users, developers, and mentors on the module. Study the possibilities of the upgrade module, and code a rough draft to be worked on. **** Week #2: 29 May - 4 June Finish successfully moving the old script intact to an object oriented module. Write tests for the current object oriented module. **** Week #3: 5 - 11 June Study =Catalyst= scripts and =Catalyst::ScriptRunner=, derive a code from both to merge to the project. **** Week #4: 12 - 18 June Write the upgrade methods and add tests for those. **** Week #5: 19 - 25 June Add the module to Dancer's core and run it against several outdated setups. Review the results and calibrate the tests to the resulting patterns. **** Week #6: 26 June - 2 July Add an upgrade log file for the upgrade process for outdated Dancer setups. **** Week #7: 3 - 8 July Go over the tests and add any missing test to allow extensive coverage. **** Week #8: 10 - 16 July Prepare the Midterm report, describe the status of the project and further plans. **** Week #9: 17 - 23 July Document the module, and the config.yml **** Week #10: 24 - 30 July Write a code hand-out of the plugins implementation: How it must work, how will it work and for what functions. Add detailed tests to each plugin function. **** Week #11: 31 July - 6 August Calibrate and polish the plugin implementations, while tracing each test successful output to see what can be added. Write a rough draft of the documentation relating the plugin feature. **** Week #12: 7 - 13 August Review the documentation and make it more user-friendly. **** Week #13: 14 - 22 August Finish what was left undone, make sure the tests are well-written, the coverage is high and the documentation covers every aspect of the project.